ROI estimator

How much engineering capacity is tied up in variants?

Adjust the inputs to match your operation. Results update instantly and are estimates based on the assumptions shown — not a guarantee.

Estimated annual impact
Hours recovered per year
—
Equivalent full-time staff
—
Labour capacity value
—
Average quote wait reduced by
—
Year-one cost (plan + implementation)
—
Estimated payback
—

Assumptions

  • Automated configurations still receive the engineering review time you enter.
  • FTE assumes 1,800 productive hours per year.
  • Wait reduction applies only to the automated share, assumed to wait half a day for review.
  • Value is recovered capacity at loaded cost — time your team can redeploy — not necessarily a cash saving.
  • Payback divides implementation cost by monthly value net of subscription.

Want us to check these numbers with you?

In discovery we look at a sample of real requests and estimate the repeatable share with your engineers.